Our team's challenge was to review the ventilation requirements for the Rapid Transit Rail Line in Singapore.
Working with Leighton Asia, EIC Activities’ concept design addressed ventilation requirements for top-down excavation methodology and multiple closed tunnel sections.
A series of off-the-shelf, self-contained systems addressed requisites for minimum velocity, pollutant control and temperature control and provided flexibility for re-purposing the systems throughout the construction sequence.