Working with CPB Contractors on the Transmission Gully motorway in New Zealand our challenge was the assessment of the project's design adequacy.
EIC Activities provided a detailed review of the geotechnical model used for embankment stability and deformation analysis, including assumptions about the groundwater table and soil strength parameters.
Findings agreed with the project’s expected settlement conditions, and demonstrated the adequacy of the project’s design and risk mitigation methods for the client.