Transmission Gully – New Zealand

Working with CPB Contractors

Project: Transmission Gully – New Zealand

Challenge 

Assessment of design adequacy

Solution 

EIC Activities provided a detailed review of the geotechnical model used for embankment stability and deformation analysis, including assumptions about the groundwater table and soil strength parameters. Findings agreed with the project’s expected settlement conditions, and demonstrated the adequacy of the project’s design and risk mitigation methods for the client.